1. Week by Week

Week of March 27, 2017

Read More
BHSRENO624.jpg
2 / 166

BHSRENO624.jpg

Metal edging that has been removed from Bangor High School's roof lies on the school's side lawn. As part of the multimillion-dollar renovation, the expansive building's roof is undergoing significant improvements. (BDN PHOTO BY KATE COLLINS)

CAPTION

As part of the multimillion dollar renovation at Bangor High School, the roof of the expansive building is currently undergoing significant improvements, including the replacement of metal edging. Pictured above is the old metal edging, which has been removed and is temporarily on the side lawn of the school. (BDN by Kate Collins)

  • BHSRENO624.jpg
  • BHSRENO624.jpg
  • elvers053015 016.JPG
  • elvers053015 016.JPG
  • vetdrugs020717 1.jpg
  • HOMESHOW 033117 B LCO
  • HOMESHOW 033117 B LCO
  • HOMESHOW 033117 A LCO
  • HOMESHOW 033117 A LCO
  • SwansIsland092916 3.jpg
  • SwansIsland092916 3.jpg
  • SwansIsland092916 3.jpg
  • AAgirlsBangor021617 002.JPG
  • AAgirlsBangor021617 002.JPG
  • BlackJackShip 033117 F LCO
  • BlackJackShip 033117 F LCO
  • BlackJackShip 033117 E LCO
  • BlackJackShip 033117 F LCO
  • BlackJackShip 033117 E LCO
  • BlackJackShip 033117 D LCO
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.